Skip to content
F.A.SPainter &
Decorator
How I work

Most of the job is the part you stop seeing.

What happens before a topcoat goes on, and the four steps a job runs through from the first look at it to the walk round at the end.

Before a brush goes near it

Paint is the last thing that happens.

A finish only lasts as long as what is underneath it. Two coats of good emulsion over a dusty, cracked, unsanded wall will look right for a fortnight and then show every fault back through. Most of a decorating job is the part you stop being able to see once it is finished.

  1. Filling

    Cracks get raked open first so the filler has something to grip, then filled, left to go off properly and sanded flush. Deep ones get done twice, because filler sinks as it dries. Rushed filling shows up as a shadow down the wall the first sunny morning after the job.

  2. Sanding

    By hand on woodwork, orbital on the big flat areas, working down through the grits rather than jumping straight to fine. Old gloss gets keyed back so the next coat has something to hold. Then the lot gets dusted off and wiped down, because paint will not key to dust.

  3. Caulking

    The gap where skirting meets wall, and where architrave meets plaster, gets caulked and wiped back to a clean line. It takes an hour or two across a room and it is most of the difference between a room that looks decorated and a room that just looks painted.

  4. Priming and sealing

    Bare plaster takes a mist coat thinned down so it soaks in instead of sitting on top. Bare wood gets primed and every knot gets sealed, or the resin comes through the gloss inside a year. Water stains, smoke and nicotine get a stain block first — emulsion alone will not hold them back.

  5. Protection

    Cotton dust sheets over floors and furniture rather than plastic, because plastic slides underfoot. Sockets, switch plates and door furniture come off instead of getting cut around. Frames and glass masked where masking is quicker, cut in by hand where by hand looks better.

It is the least interesting part of the week and it is the part that decides whether you are looking at the same walls in eight years or repainting them in three.

How a job runs

Call, price, sheets down, done.

  1. Step 1: Call and look at the job

    You ring. I come out and look at what needs doing, measure up and check what is underneath — plaster, old gloss, damp, anything that changes the work.

  2. Step 2: Written price

    You get the price in writing, broken down by room or area. It covers the preparation as well as the paint, and says how many coats are going on.

  3. Step 3: Sheets down, prep, paint

    Furniture moved and covered, floors sheeted, then all the filling, sanding, caulking and priming. Topcoats go on last, once the surface is ready for them.

  4. Step 4: Tidied, checked, snagged

    Sheets up, sockets back on, floors swept. We walk round it together in daylight, and anything you are not happy with gets put right before I leave.